Where the system runs: 80+ projects by client type
More than 80 NEMT projects are live across China, and they fall into three client types. The pattern across those deployments is more useful than any single reference. This page describes what distinguishes the three types, why no client list is published, and what actually decides how long a rollout takes.
The three client types
- City-level transport operators — an owned fleet, one or several dispatch centers, the single-operator edition managing vehicles, drivers and settlement.
- Hospital escort and transfer services — mainly discharge, transfer and follow-up runs; high volume, short distance, with response and handover evidence as the priority.
- City dispatch platforms — the platform holds no vehicles of its own, several providers are admitted, and the city edition handles admission, oversight and split settlement.
| Client type | Typical fleet | What they buy first | What hurts most before go-live |
|---|---|---|---|
| City transport operator | Tens of vehicles, one or two dispatch centers | Trip core, fare rules, driver app | Fare rules that exist only in a spreadsheet |
| Hospital escort service | Small fleet, high daily volume | Intake pool, geofence arrival, handover evidence | Abandoned calls and verbal handovers |
| City dispatch platform | Network of providers, no owned fleet | Provider admission, oversight, two-tier settlement | Credential files scattered across providers |
Why no client list is published
Client contracts constrain naming. When a peer reference is needed, the conversation starts with your business type and fleet scale, and a comparable project is described with its implementation scope and rollout duration in de-identified form. Client names are not used as marketing material, and no logo is published without written permission.
What can be verified is the company and product record: high-tech enterprise status, software enterprise registration, 13 patents, 34 software copyrights, 8 registered trademarks, plus software product certificates and registered test reports. Certificate numbers are collected on the certifications page and can be cited directly in a tender or a due-diligence pack.
What decides rollout duration
Three variables matter more than project size:
- Completeness of vehicle and staff records — registration, insurance, inspection, licenses and qualifications, each with a validity period. Missing records delay the credential gate, not the software installation.
- How many fare rules exist — one rule set for one service level is fast; several cities, service levels and payer types multiply configuration and testing.
- Whether telephony and vehicle hardware must be integrated — CTI, in-vehicle terminals and cameras add joint debugging, which is where most calendar time goes.
Projects with complete records and a single rule set move fastest. Projects with hardware integration spend most of the schedule on interface testing rather than on the platform itself.
Frequently asked questions
Can we speak to an existing client? Not by name. A comparable project can be described in de-identified form, including scope, fleet size and rollout duration, and reference calls are arranged only with the client's consent.
Does the 80+ figure include trials? It counts delivered, live projects rather than pilots or demonstrations.
How long does a typical rollout take? It depends on the three variables above. A single-site deployment with complete records and one fare rule set is measured in weeks; multi-site or hardware-integrated projects are measured against the integration schedule.
To size a configuration against your own fleet, see pricing and deployment; the phase breakdown and acceptance criteria are in implementation; edition differences are in the product overview.
Reference: National Health Commission — the policy context for non-emergency patient transport services in China.